¹Ù·Î°¡±â ¸Þ´º
¹Ù·Î°¡±â ¸Þ´º
º»¹®³»¿ë ¹Ù·Î°¡±â
¸ÞÀθ޴º ¹Ù·Î°¡±â
Dr. Kang, Aastha, Yuyeol, Sehee & Tushar visited Gwangneung site. It was cloudy & windy.
In GCK,
Installed four LED sensor in the second tower,
Replaced Li7500 from the 40m,
Profile system calibrated,
Data collected.
Measured LAI.
There is no tree in the opposite side of the road. Heavy pruning also done around the tower. As a result, LAI decreases compare to previous time.
In GDK,
Replaced calibrated Li 7500 in the 40 m & take out another LI 7500 from 20m for calibration in the main tower.
Profile system calibrated,
Data collected,
LAI measured.