We reached at Haenam site on Friday at 9:30 am. We checked the systems, fix the modem device, levelling rain gauge ( at 10:00 am), clean the lens of Li 7500 (at 10:10 am), collecting serial number (Control box of li7500 0343, Li 7500 0343, Pyronometer Q33912 & CNR1 980125). It was cloudy & winday at morning (9:30 am) & leter it was sunny day (after 10:30). There was burning of crop residues in the eastern site of the tower. |