¹Ù·Î°¡±â ¸Þ´º

¹Ù·Î°¡±â ¸Þ´º º»¹®³»¿ë ¹Ù·Î°¡±â ¸ÞÀθ޴º ¹Ù·Î°¡±â

ÁÖ¿ä¾È³»

¸Þ´ºº¸±â
Á¦¸ñ
2013.03.15: Dr. Kang, Juyeol & Tushar visited Haenam
ÀÛ¼ºÀÏ
2013-03-16
Á¶È¸¼ö
254


We reached at Haenam site on Friday at 9:30 am. We checked the systems, fix the modem device, levelling rain gauge ( at 10:00 am), clean the lens of Li 7500 (at 10:10 am), collecting serial number (Control box of li7500 0343, Li 7500 0343, Pyronometer Q33912 & CNR1 980125). It was cloudy & winday at morning (9:30 am) & leter it was sunny day (after 10:30). There was burning of crop residues in the eastern site of the tower.
 »çÁø 
 
2 
3 
3 
3 
3 
3 
3 
3¤§ 









÷ºÎÆÄÀÏ:
÷ºÎÆÄÀÏÀÌ ¾ø½À´Ï´Ù.
³ªµµÇѸ¶µð

³ªµµÇѸ¶µð

´ÙÀ½±Û
2013.03.21 Aastha, Tushar & Yohana visited Gwangneung
/ Çб³°ü¸®ÀÚ
It was sunny day. In GDK, Profile system callibrated, Data collected except CF card. System checked. All ts data transfer to external hard drive. In GCK, profile system calibrated. Data collected (including from both CF card). Li7500 sensor replaced by another calibrated Li7500 sensor..
ÀÌÀü±Û
2013.03.14: Dr. Kang, Juyeol & Tushar visited Gimje
/ Çб³°ü¸®ÀÚ
We arrived at Gimje site on Thursday at 4:00 pm. There was power problem in Li7700 (rssi 0.2 & diag -2E) . After fixing this problem,value ofrssi_li77 & diag_li77 were 76 & 15 , respectively. Now also it operates properly . Beside this, we checked the systems, collected data, cle..