Album
- ´ÙÀ½±Û
- 2013.03.08 Dr. Kang & Aastha visited Gwangneung
- / Çб³°ü¸®ÀÚ
- In GCK, Data back up ( including CF cards except EC 40 m ) and profile system calibration.
GDK: Profile system calibration , data back up ( including all CF cards), measured LAI .
GDK met and GDK EC --> data lost due to compile errors from Feb 14 th to March 8 th 13:00 pm ( about 3 week..
- ÀÌÀü±Û
- 2013.02.22 Juyeol & Tushar visited Gimje site
- / Çб³°ü¸®ÀÚ
-
It was cloudy & windy day ( 6m/sec). We collected data, checked the system & changed the liquid. A new program (1 min instead of 30 sec)?was send to Li 7700.
The value of some impotant variables are given below:
Fc_wpl 0.12mgm-2s-1 , LE_wpl -12.64 Wm-2 , Hc 38.57 ?Wm-2, tau 0.13, u..